Title Image

Archive

Kirtley-Cole Associates Corporate Office

Kirtley-Cole Associates recently relocated to the heart of downtown Everett. Our team converted a space that had previously seen many uses over its long history to our new corporate office. The building was originally constructed in 1920. As part of the project, original elements were

Camano Island Library / Sno-Isle Libraries

Kirtley-Cole Associates teamed with Sno-Isle Libraries to construct a new 5,400 SF library for the Camano Island community. The project included the renovation of an existing 4,500 SF restaurant space as well as a 900 SF addition. The new space features book and media selection

Hamlin Robinson School

Kirtley-Cole Associates teamed with Hamlin Robinson School to complete the new construction of a 3-story, 45,000 SF building. The new school includes a library, science lab, art and music rooms, gym, innovation/tech Lab, the HRS Learning Center, and a total of 21 classrooms. Hamlin Robinson

Astronics

Kirtley-Cole Associates teamed with Astronics Advanced Electronic Systems on the construction of their new facility in Kirkland. The new facility for the growing Astronics AES consists of 98,238 square feet of office, cabin electronics, production, testing and engineering, receiving and shipping, and material storage areas.

Skagit Regional Clinics – Riverbend

Kirtley-Cole Associates recently teamed with Skagit Regional Health to construct a new, state-of-the-art 39,100 SF multi-specialty clinic and medical office building. The facility includes urgent care, dermatology, pediatrics, lab, X-ray and pharmacy services. The structure is composed of slab-on-grade, slab-on-metal deck, structural steel framing and

The Evergreen School

Kirtley-Cole Associates recently teamed with The Evergreen School to expand and improve their facilities. The major campus improvement project enhanced the student experience with the addition of approximately 15,000 SF of learning and collaboration space and the renovation of an additional 29,000 SF. The project

Koz Development – Everett Community College Student Housing

Kirtley-Cole Associates completed construction of a new 6-story micro-housing project near Everett Community College for Koz Development. The 38,652 SF student housing facility houses 120 units of just over 200 SF each and a mini-kitchen, common areas for the residents to gather, larger common kitchens

Monroe Family Village – Housing Hope

Kirtley-Cole Associates completed the new construction of Monroe Family Village, a wood-framed, 47-unit, 8-building apartment complex totaling 50,650 SF on 2.36 acres. The project also included a community building, playground, community gardening area and sports court. The site is designed with a self-contained storm system

King’s Schools Science and Technology Building

Kirtley-Cole Associates teamed with CRISTA Ministries and King’s Schools to construct a new 3-story, 26,461 SF science and technology building on the occupied King’s Schools campus. The new building is located immediately to the south of the current King’s High School on the CRISTA Ministries

Seattle Waldorf High School

Kirtley-Cole Associates completed a tenant improvement of the existing 13,566 SF Building 11 in Magnuson Park for Seattle Waldorf High School. Our team worked with Seattle Waldorf School to transform the 1940’s former Navy building into a new high school. In addition to classrooms, the

Lincoln Hill Village – Housing Hope

Kirtley-Cole Associates once again teamed with Housing Hope to construct a new residential facility: Lincoln Hill Village. The project involved new construction of 24 units in 5 separate buildings. A sixth building serves as a commons building with laundry facilities, a meeting area, and management offices.

Summit Sierra High School Charter School

Kirtley-Cole Associates teamed with NAC Architecture, Washington Charter School Development and Summit Public Schools to construct Sierra High School, one of the State of Washington’s first public charter schools. The renovation, addition, and significant structural upgrades to an existing metal building will create a new 2-story,

St. Joseph Hospital

Major projects completed at St. Joseph Hospital include: Emergency Department. Phased remodel of an 11,000 SF occupied Emergency Department that includes new reception, triage, treatment, trauma, and nurse station areas. Laboratory Remodel. Phased remodel of occupied microbiology, blood bank, hematology and chemistry laboratories. The project includes building

Seattle Pacific University

Kirtley-Cole Associates has teamed with Seattle Pacific University to complete multiple projects on their occupied campus, some of which include: Hill Hall Restroom Upgrades Extensive alteration and upgrade of 5 existing group bathrooms in the women’s wing; 4 existing group bathrooms in the men’s wing; 2 existing

Hyundai of Everett

Kirtley-Cole Associates teamed with Hyundai of Everett to complete their recent project in Everett. The project included interior demolition followed by a 4,000 SF renovation that included structural steel bracing, new building profile, ACM siding, upgraded mechanical and electrical systems and completely new interior finishes.